A sample of 'Before' and 'After' photographs to allow you to see some of our previous projects and what we can do to help you create your initiative.
The original cottage was demolished and a new build was constructed in 9 months
'Before'
A master bedroom with en-suite bathroom was created in the roof space, together with a ground and first floor refurb.
Getting prepared to strip the roof.
Roof stripped ready for the master bedroom.
Master bedroom taking shape.
Staircase from first floor to master bedroom.
Stairwell foyer - very elegant.
Beautiful loft area - finishes perfectly in keeping with the house.
Beautiful loft area - finishes perfectly in keeping with the house.
Bath in the master bedroom.
Shower and WC at end of master bedroom.
A complete house refurbishment and extension in 6 months.
'After' - front elevation.
'Before' - front elevation
Works really coming on.
'Before' - rear elevation.
'Before' - rear elevation.
Rear elevation nearly complete.
The project took 12 months to complete - the house was gutted after a fire and the customer said the finished works were beyond expectations.
'Before'
House completely stripped back.
During works - exciting to see it really come on.
Beautiful roof design, using fabulously skilled trades.
A complete house refurbishment, with a ground floor extension and installation of swimming pool and garden building.
'Before' - rear elevation.
'Before' - rear elevation, works in progress.
During works.
The build starting to take shape using skilled trades.
Beautiful kitchen area in keeping with the house.
Kitchen
Hallway
Swimming pool and garden building.
Fun garden building.
Stunning lounge area.
Lots of light in the family area.
'After' - front elevation. Took six months to complete
'Before' - front elevation.
'Before' - rear elevation
'After' - rear elevation
Project took 12 weeks - pool install and ceramic paving. This scheme also included oak frame garden room with sauna, games room, bathroom/changing facilities.
Project took 12 weeks - pool install and ceramic paving. This scheme also included oak frame garden room with sauna, games room, bathroom/changing facilities.
Project took 12 weeks - pool install and ceramic paving. This scheme also included oak frame garden room with sauna, games room, bathroom/changing facilities.
Project took 12 weeks - pool install and ceramic paving. This scheme also included oak frame garden room with sauna, games room, bathroom/changing facilities.
PORTFOLIO
Complete house renovation and ground floor extension in six months, Harpenden