Project Gallery

A sample of 'Before' and 'After' photographs to allow you to see some of our previous projects and what we can do to help you create your initiative.

New Build in Great Wakering
The original cottage was demolished and a new build was constructed in 9 months
New Build in Great Wakering
'Before'
Loft conversion and house refurbishment, Great Wakering
A master bedroom with en-suite bathroom was created in the roof space, together with a ground and first floor refurb.
Loft conversion and house refurbishment, Great Wakering
Getting prepared to strip the roof.
Loft conversion and house refurbishment, Great Wakering
Roof stripped ready for the master bedroom.
Loft conversion and house refurbishment, Great Wakering
Master bedroom taking shape.
Loft conversion and house refurbishment, Great Wakering
Staircase from first floor to master bedroom.
Loft conversion and house refurbishment, Great Wakering
Stairwell foyer - very elegant.
Loft conversion and house refurbishment, Great Wakering
Beautiful loft area - finishes perfectly in keeping with the house.
Loft conversion and house refurbishment, Great Wakering
Beautiful loft area - finishes perfectly in keeping with the house.
Loft conversion and house refurbishment, Great Wakering
Bath in the master bedroom.
DSC_0563[1]
Shower and WC at end of master bedroom.
Refurbishment and extension, Thorpe Bay
A complete house refurbishment and extension in 6 months.
Refurbishment and extension, Thorpe Bay
'After' - front elevation.
Refurbishment and extension, Thorpe Bay
'Before' - front elevation
Refurbishment and extension, Thorpe Bay
Works really coming on.
Refurbishment and extension, Thorpe Bay
'Before' - rear elevation.
Refurbishment and extension, Thorpe Bay
'Before' - rear elevation.
Refurbishment and extension, Thorpe Bay
Rear elevation nearly complete.
Complete home renovation after devastating fire, Chalkwell
The project took 12 months to complete - the house was gutted after a fire and the customer said the finished works were beyond expectations.
Complete home renovation after devastating fire, Chalkwell
'Before'
Complete home renovation after devastating fire, Chalkwell
House completely stripped back.
Complete home renovation after devastating fire, Chalkwell
During works - exciting to see it really come on.
Complete home renovation after devastating fire, Chalkwell
Beautiful roof design, using fabulously skilled trades.
House refurb, extension and swimming pool, Shoebury
A complete house refurbishment, with a ground floor extension and installation of swimming pool and garden building.
House refurb, extension and swimming pool, Shoebury
'Before' - rear elevation.
House refurb, extension and swimming pool, Shoebury
'Before' - rear elevation, works in progress.
House refurb, extension and swimming pool, Shoebury
During works.
House refurb, extension and swimming pool, Shoebury
The build starting to take shape using skilled trades.
House refurb, extension and swimming pool, Shoebury
Beautiful kitchen area in keeping with the house.
House refurb, extension and swimming pool, Shoebury
Kitchen
House refurb, extension and swimming pool, Shoebury
Hallway
House refurb, extension and swimming pool, Shoebury
Swimming pool and garden building.
House refurb, extension and swimming pool, Shoebury
Fun garden building.
House refurb, extension and swimming pool, Shoebury
Stunning lounge area.
House refurb, extension and swimming pool, Shoebury
Lots of light in the family area.
Rear two-storey extension and new roof, Thundersley
'After' - front elevation. Took six months to complete
Rear two-storey extension and new roof, Thundersley
'Before' - front elevation.
Rear two-storey extension and new roof, Thundersley
'Before' - rear elevation
Rear two-storey extension and new roof, Thundersley
'After' - rear elevation
Complete swimming pool design and installation
Project took 12 weeks - pool install and ceramic paving. This scheme also included oak frame garden room with sauna, games room, bathroom/changing facilities.
Complete swimming pool design and installation
Project took 12 weeks - pool install and ceramic paving. This scheme also included oak frame garden room with sauna, games room, bathroom/changing facilities.
Complete swimming pool design and installation
Project took 12 weeks - pool install and ceramic paving. This scheme also included oak frame garden room with sauna, games room, bathroom/changing facilities.
Complete swimming pool design and installation
Project took 12 weeks - pool install and ceramic paving. This scheme also included oak frame garden room with sauna, games room, bathroom/changing facilities.

PORTFOLIO

Complete house renovation and ground floor extension in six months, Harpenden

'After'
'Before'
New Build in Great Wakering
New Build in Great Wakering
New Build in Great Wakering
New Build in Great Wakering
New Build in Great Wakering
New Build in Great Wakering
'Before' - front elevation
'After' - front elevation

Get in Touch



Call us: 07977 410114
unsplash